Investor Presentaiton
Total Tonnes Mined (Millions)
Upside Potential
Ongoing drilling and project optimisation promises significant future upside.
➤ Infill & Expansion Drilling - improved resource estimation & additional mineable ounces
Optimized Mine Plan - higher mining rate & lower stripping
➤ Enhanced Metallurgical Process - process optimisation & higher throughput
Exploration - potential for additional breakthrough discoveries
25,00
Tonnes Mined - Diluted Grade
30,00
1,40
140 000
1,20
20,00
15,00
10,00
5,00
1,00
0,80
0,60
0,40
0,20
0,00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Twin Hills & Bulge Ore
Clouds Ore
Waste
Grade
Diluted Grade (g/t)
Ounces Produced
120.000
100 000
80 000
60 000
40 000
Gold Production
OSINO
RESOURCES
1,60
1,40
1,20
1,00
0,80
0,60
0,40
0,20
0
0,00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Cumulative Gold Production
Gold Production
20 000
Indicated Mineral Resource of 14.0 million tonnes ("Mt") at 0.98 g/t Au and an Inferred Mineral Resource of 46.2 Mt at 1.02 g/t Au from 69,000m of drilling included in the MRE. 31,987m drilled since MRE (not included in PEA) All the additional drilling will be
included in subsequent updates of the Mineral Resource once the drill program has been completed and all corresponding assay results have been received.
Millions
Cumulative Ounces Produced
16View entire presentation