Safety Evaluation Of Indian Nuclear Power Plants Post Fukushima Incident slide image

Safety Evaluation Of Indian Nuclear Power Plants Post Fukushima Incident

Status of Indian NPPs Operating plants: 2 Boiling Water Reactors (BWR) of 160 MWe each. • 16 Pressurized Heavy Water Reactors (PHWRs) of 220 MWe each. • 2 PHWRs of 540 MWe each. Plants Under Construction: ● • 4 units of 700 MWe PHWRs are under construction. 2 units of Russian WWERS- Pressurized Water Reactors (PWRs) of 1000 MWe each are under advanced stage of construction. The present total installed capacity of nuclear power in India is 4780 MWe. The accumulated experience of safe operation through these reactors is 330 reactor years.
View entire presentation