PTTEP Project Details and Financial Performance slide image

PTTEP Project Details and Financial Performance

Projects Details | Thailand 1 Arthit 2 B6/27 Sales Vol Gas Sales Vol Liquid Project Name Status Phase Participating Interest* (%) Latest Status (MMSCFD) (KBPD) OP Production PTTEP 80% 280 15 Ensure gas delivery at the highest DCQ Chevron 16% MOECO 4% OP gp Production PTTEP 100% PTTEP Prepare for decommissioning activities The Final Decommissioning Plan (FDP) and Decommissioning Cost Estimation (DCE) were approved by DMF . 12 Normal operations JV Production 3 B8/32 & 9A PTTEP 25.00% 40 40 Chevron 51.66% MOECO 16.71% KrisEnergy 4.63% Palang Sophon 2% OP Production 4 Bongkot PTTEP 66.67% 508 17 TotalEnergies 33.33% OP Production 5 G12/48 PTTEP 66.67% 9 TotalEnergies 33.33% JV 6 Contract 4 (Pailin) M Production PTTEP 60% 405 15 Chevron 35% MOECO 5% JV 7 E5 M Production PTTEP 20% 7 ExxonMobil 80% Note: * ** PTTEP denotes respective PTTEP subsidiaries participating in the project Sales volume represent average volume for 100% of the project during 3M2023 *** Status: OP PTTEP operatorship/JOC = PTTEP joint operatorship/ JV = PTTEP Joint Venture Partner **** DCQ Daily Contractual Quantity 33 The remaining block was ended on 7 Mar 2023 and transitioned to G2/61 under PSC. Normal operations Ensure gas deliverability level at DCQ. On-going drilling additional development wells activities. Maximize gas potential at CDC level.
View entire presentation