Investor Presentaiton
SPIC BRASIL
About SPIC Brasil
Our energy comes from multiple sources
Vision-driven progress
Safety is the foundation of care
GRI Summary
69
reading the water meters of each well. The results are recorded in an
environmental measuring and monitoring spreadsheet. The water
obtained in the wells is chlorinated, and we analyze the potability
indicators monthly in accordance with the standards established
in Ordinance GM/MS no. 888 of May 04, 2021. In 2022, the total
accumulated by the three wells at HPP São Simão was 9,909.8 m³,
and by the two wind farms' wells, 602.55 m³. The recorded water
consumption was 10.5 ml: 9.91 at the HPP, 0.58 at Vale dos Ventos
and 0.01 at Millennium.
Energy consumed (GJ) GRI 302-1
Electricity
Energy GRI 302-1, 302-3
The energy intensity within and outside the organization was not
significant in 2022, since we are energy generators and use a very
small percentage of the amount generated to perform our activities.
369,846
550,452.52
2021
2022
Fuel consumption - nonrenewable (GJ) GRI 302-1
Petroleum (fuel)
Total
2021*
2022
812.4
812.4
1,094.03
1,094.03
*The data for 2021 has been updated to better align with reporting standards.
Fuel consumption - renewable (GJ) GRI 302-1
2021
2022
248,50
Wind Power
Ethanol
Total
248, 50
62.84
62.84
Total energy consumed (GJ) GRI 302-1
Electricity sold (GJ) GRI 302-1
Electricity
34,329,067.2
33,156,219.6
2021*
2022
*The data for 2021 has been updated to
better align with reporting standards.
Nonrenewable fuels
Renewable fuels
Power consumed
Power sold
Total
2021*
812.4
248.50
369,846
34,329,067.2
-33,958,160.3
2022
1,094.03
62.84
550,452.52
33,156,219.6
-32,604,610.21
*The data for 2021 has been updated to better align with reporting standards.
The information regarding the consumption of energy, fuels and water in Operations - HPPSS Vale
dos Ventos and Millennium is compiled in a form that is updated monthly - FOP.033. Data conversion
performed at https://www.converter-units.info/. We took into account the consumption related exclusively
to operations; we did not count corporate and outsourced offices.View entire presentation