NHPC Renewable Energy and Pump Storage Project Updates

NHPC - Projects in Operation... contd. Renewable Energy एनएचपीसी NHPC 32 S.No Project Installed Design Capacity Energy Year of Comm. Capital Cost as on 31.03.2023 Tariff 2 Tariff 22-23 Place of Project (Rs./unit) (MW) (MU) Wind Power 50 94.25 2016 330.40 3.67 Lakhmana, Jaisalmer 2 Solar Power 50 105.96 2018 290.59 4.41 Theni/Dindigul District, Tamilnadu Total-B 100 200.21 620.99 5551 24801.58 40437.84 4.14 Sub Total Stand-alone(A+B) Operational Projects with Subsidiary S.No Project Installed Design Capacity Energy Year of Comm. Capital Cost as on 31.03.2023 Tariff 22-23 (Rs./Kwh) Type of the project (MW) (MU) 1 Indrasagar, (8x125) 1000 1423.26 2005 5326.43 3.80 Storage Madhya Pradesh 2 Omkareshwar, 520 736.46 2007 3138.08 4.62 Storage (8x65) Madhya Pradesh Total-C 1520 2159.72 8464.51 4.08 Grand Total- 7071 26961.30 D:(A+B+C)