Investor Presentaiton slide image

Investor Presentaiton

AUKI KING AKN RBA313 15m @ 0.25% Cu from 2m RBC022 3m @ 0.2% Cu from 25m Untested Geophysical anomaly 1.5km Open 1.7km Untested Geophysical anomaly RBC033 14m 5 D.337. Cu from 28m RBC075 9m @0.7% Cu 2km from 25m RBC007 9m @ 0.4% Cu from 26m Emull Deposit E 8004957 RBC042 em cũ Ū.I Cu froor Cm KOONGIE PARK PROJECT EMULL PROSPECT Wide, near surface copper and zinc sulphide mineralisation confirmed in August 2022. EMRC002-74m @ 0.36% Cu, 0.71% Zn, and 6g/t Ag from 106m EMRC004-89m @ 0.36% Cu, 1.18% Zn and 9g/t Ag from 61m EMRC007-25m @ 0.46% Cu, 1.55% Zn and 8g/t Ag from 34m and EMRC009-86m @ 0.33% Cu, 0.09% Zn and 2g/t Ag from 53m Results consistent with historic exploration by Northern Star Resources (2004 - 2009). 19000 319500 20500 321000 821500 322000 322500 23000 323500 Refer ASX release dated 12 August 2022 Potential for a shallow, bulk tonnage, open pit operation. 8
View entire presentation