Financial Performance and Strategic Outlook
Cactus Equipment Positioned on a Multi-Well Pad
4
3
2
4
G
1
Cactus
Wellhead
1
Product Sold
2 Equipment Rented
3 Equipment Rented
4
Services Provided
3
■ Wellheads are required
by each well over
production life
■ One of the first pieces
of equipment to
be installed
Cactus wellheads
installed below surface
■ Production trees installed
on the wellhead after the
frac stacks are removed
■ Frac stacks are
connected to the
wellhead for the
fracturing phase
of a well
■ Must reliably withstand
all liquids and proppants
that are pumped
downhole
to fracture
Zipper manifolds, mono-
bore flowline and remote
greasing units used
during the fracturing
process
■ Allow fracing to
seamlessly shift from well
to well while reducing
connections for high-
pressure equipment
■ Assist with the
installation, maintenance
and handling of the
wellhead and pressure
control equipment
■ Variety of equipment to
install and service, such
as high-pressure flow
iron, closing units, crane
trucks and testing units
Note: Cactus equipment shown not inclusive of all Rental innovations described on preceding slides.