JSC Atomenergoprom Annual Report
JSC ATOMENERGOPROM TODAY
JSC ATOMENERGOPROM / ANNUAL REPORT / 14
KEY EVENTS IN 2022
-
-
NPP and WPP construction
May
A permit was obtained for the construction of the Kuzminskaya WPP in the Stavropol Territory.
June
An agreement on cooperation in the implementation of wind power projects was signed
with the government of the Chukotka Autonomous District.
The Company obtained a permit for the construction of the 95 MW Trunovskaya
WPP in the Stavropol Territory.
July
Official ceremonies were held to mark the start of concreting at the site of power unit
No. 1 of El Dabaa NPP in Egypt (20 July) and the start of concreting of the foundation of power
unit No. 2 (November 2022).
On 21 July, concreting was started at the construction site of power unit No. 4
of Akkuyu NPP in Turkey.
August
An agreement was signed with An Xuan Energy (Vietnam) to jointly implement
a wind power project in the Son La Province.
December
The Berestovskaya WPP in the Stavropol Territory was put into operation.
New products and technological sovereignty
March
The Mechanical Engineering Division completed the first operability tests of a liquefied
natural gas (LNG) pump.
August
An official ceremony was held to mark the start of pilot operation of the first industrial
facilities forming part of the Nuclear Research and Technology Centre in El Alto, Bolivia.
September
A cooperation agreement was signed with China Energy Engineering Corporation
to build a hydrogen production plant on Sakhalin Island.
October
The construction of the first lithium-ion battery 'gigafactory' was started in the
Kaliningrad Region.
The construction of the first stage of a data centre in Innopolis (Republic of Tatarstan) was started.
X5 Group acquired licences for the use of an RPA platform, Atom. RITA (Robotic
Intelligent Technology Assistant), to configure and support software robots.
-
-
-
-
-
November
JSC SCP started to develop technologies for stable isotope production based on
fractional distillation and chemical isotope exchange.
December
The construction of a new building of the Dmitry Rogachev National Medical Research
Centre of the Russian Ministry of Health was completed.
Small nuclear power plants
September
The engineering design of the RITM-200N reactor unit was developed.
Business development
January
JSC Quadra - Power Generation was included in the scope of the Company. It supplies heat
and electricity to regions of the Central Federal District.
December
A contract was concluded with a Brazilian state-owned company Industrias Nucleares do
Brasil for the supply of uranium products for Angra NPP to meet 100% of its needs between
2023 and 2027.
Environmental protection
April
The main stage of the site restoration project was started at the Krasny Bor landfill
in the Leningrad Region.
Research and innovations
April
The Russian poloidal field coil (for plasma containment) for the ITER international
project in France underwent the final test.
July
A registration certificate was obtained for the Onyx radiation therapy facility
based on a linear electron accelerator.
December
The welding of the support plate for the innovative BREST-OD-300 fast reactor,
which is being built in Seversk (Tomsk Region) as part of the Proryv Project, was started.
JSC ATOMENERGOPROM TODAY
JSC ATOMENERGOPROM / ANNUAL REPORT / 15View entire presentation