ESG: Our 'Beyond Compliance' Approach

NEAR TERM ORGANIC GROWTH ROYAL SHEBA PROGRESS • In the last quarter of FY21 the Group initiated a 10,000 ton bulk sample project: • Utilising the existing Royal Sheba adit on surface • • • • Access to the ore body is achieved by a trackless decline system • The bulk sample ore is to be extracted from 23m below adit elevation • This level will be accessed in the fourth quarter of FY22 It is expected that the bulk sample will yield 18kg of recovered gold • Mining could be extended on the same level to access an additional 10,000 tonnes at ~2g/t 23 Level haulage from Sheba Mine ZK Shaft at ~180m from expected Royal Sheba mineralisation Scheduling the Royal Sheba ore through the available capacity of the BTRP plant alone indicates a 20 year life-of-mine at a steady state production of 25koz per year Option to increase production to 40ktpm of run-of-mine with incorporation of New Consort and Sheba plants Oz per year 30 000 25 000 20 000 15 000 10 000 11-2021 -RS-DEVOUCH 6.PS RANAY 01-3022 GR-DECE 6PS-NOLLBAY OPERATIONAL PERFORMANCE BY ASSET LEGEND Old Development November 2021 Dev December 2021 Dev January 2022 Dev Planning Layout BTRP Plant estimated gold production 5.000 0 YI Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 YIO YII Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20 Tailings (oz) Royal Sheba (oz) 26
View entire presentation