Efficient Financing & Incremental Investment Opportunities
INNOVATION + TECHNOLOGY SPOTLIGHT
1.
2.
CLEAN POWER
Energy Storage
Proposed VDM export
storage project²
Power
Advancement and
growth of wind and
solar generation
Maintaining safety and
reliability with
integration of variable
renewable sources
Develop, construct
and operate a facility
of up to 500 MW
■ Li-ion technology
■ Interconnection to
CAISO
SMART, NEW ENERGY INFRASTRUCTURE1
.
•
•
LNG + NET-ZERO SOLUTIONS
Facilities
Incorporation of electric
motor drives at
liquefaction facilities
Potential to reduce
GHG emissions while
increasing production
Partnering in research
to reduce GHG
emissions throughout
the value chain
Sempra Infrastructure aims to create
CCUS
Proposed Hackberry
CCUS project²
■ 4.5 Mtpa with 3
injection wells and 89M
tonnes storage
capacity
Sequester CO2
volumes from Cameron
LNG and beyond
■ Would allow Cameron
LNG to achieve 15%
Scope 1 CO2
emissions reduction
.
ENERGY NETWORKS
Infrastructure
Alternative Fuels
Conversion of fleet
vehicles to hybrid and
electric
Production and
transportation of
alternative fuels such
as hydrogen, green
ammonia, RNG, and
biofuels
Hydrogen pipeline
infrastructure projects
leveraging existing
assets
•
investment opportunities by staying
at the forefront of energy innovations
Illustrative only and includes aspirational goals, not indicative of when, or if, certain events may occur or the order in which they may occur. Amounts are approximate.
Development of remote
asset monitoring
systems (sensors,
drones, etc.)
Replacement of analog
residential and
commercial meters with
smart meters
The ability to complete major construction projects is subject to a number of risks and uncertainties. Please also refer to "Risk Factors" in our most recent Annual Report on Form 10-K and "Capital Resources and Liquidity" in our most
recent Quarterly Report on Form 10-Q for a description of the risks and other factors associated with project development, 57
construction and other opportunities.
SEMPRAView entire presentation