Drilling Program Overview
drilling/perfurasaun
Well Schematic: Cova - 1 Exploration Well
Preliminary
Hole Sizes, Casing, Mut, Cement
All depths in mRT MO
RT-LAT 24m
Water Depth 1935 m55
RT-Seabed-1954 m85
Ditum in LAT
Leni
eni
PSC 506.83
00A 14, AMS Zone 5S
26" pilot hole and open to 42" Hole
Mud: SW+Sweeps
MW: 1.03-1.05 SG
Returns to seabed
1.89 SG Tail Cement to Seabed
1954m
36" Conductor
2014m Surface Casing
WT 1.5" RL4
20 133 ppf RL4S
2238m
12-114 Hole to-3710m
Length 1472m
DRILLING WITHOUT BOP & RISER
Mud: SW+Sweeps
MW: 1.03-1.05 SG
1.89 SG Tail Cement to 3200m
8-1/2" Hole to-4204m
Length 494m
DRILLING WITH BOP & RISER
Mud: HP Water Based Mud
MW-1.15 SG (9.6ppg)
Notes
TD=4204mRT/4180mSS
VERTICAL WELL
Intermediate Casing
9-5/8" 53.5 ppf Q125 Tenaris Blue NF
3,700m Estimated LOT: 1.28 SG
Laminaria/Plover - Firm Coring in Reservoir
1) In the success case (presence of HC), a second 27m core maybe cut and a full wireline formation evaluation performed. The well will then be abandoned
ation & production
11View entire presentation