Hindustan Zinc Strategic Priorities and Growth Overview
Projects to Strengthen Competitive Edge
Smelter and Refinery
Exploration
CPP
HINDUSTAN ZINC
Zinc & Silver of India
Expansion
Debottlenecking of smelter expansion to 1.2 Mtpa under
plan and CLZS expansion to 5.04 lac tons (environment
clearance received)
Improved Safety
Installed Pneumatic wrench machine, adopted line of fire
concept and finger saver tools and provided emergency
training
Improved Productivity
Installed in-house Proactive Process Control Composite
Sampling System at Purification Plant
Enhance Exploration
•
Development of resource model at Zawar Mines
to identify exploration targets and re-configure
mineralization
Partnered with Objectivity, Canada, to optimize
exploration drilling using DRX drill hole targeting system
Motorized directional drilling to drive efficiency at
less cost
Improved Safety
•
Established remote control room for smooth plant
operation/safe shutdown
Weighted CO2 Flooding System at Chanderiya CPP
Automated Pneumatic doors at bottom ash inspection
door across CPPs to avoid fire injuryView entire presentation