Transurban Group Strategy Overview
TOLLING ESCALATION
Transurban
MOTORWAY
M2
LCT
CCT
ED
M5 West
M7
NorthConnex
M4
M8 and M5 East
ESCALATION
Tolls escalate quarterly by the greater of quarterly CPI or 1%
Class A tolls escalate quarterly by quarterly CPI. Class A tolls cannot
be lowered as a result of deflation. Class B tolls escalate quarterly by
the greater of quarterly CPI or 1%.
Tolls escalate quarterly by quarterly CPI. The toll cannot be lowered as
a result of deflation
Tolls escalate quarterly by the greater of a weighted sum of quarterly
AWE and quarterly CPI or 1%
Tolls escalate quarterly by quarterly Sydney CPI. The toll cannot be
lowered as a result of deflation
Tolls escalate or de-escalate quarterly by quarterly CPI
Tolls escalate quarterly by the greater of quarterly CPI or 1%
Tolls escalate annually by the greater of CPI or 4% to December 2040;
the greater of CPI or 0% per annum to concession end
Tolls escalate annually by the greater of CPI or 4% to December 2040;
the greater of CPI or 0% per annum to concession end
MOTORWAY
West Gate Tunnel¹
Logan Motorway
Gateway Motorway
Clem7
Go Between Bridge
Legacy Way
AirportlinkM7
95 Express Lanes²
ESCALATION
Tolls escalate quarterly by an equivalent of 4.25% per annum from
construction completion to 30 June 2029 and quarterly CPI thereafter
Tolls escalate annually by Brisbane CPI. The toll cannot be lowered as
a result of deflation
Tolls escalate annually by Brisbane CPI. The toll cannot be lowered as
a result of deflation
Tolls escalate annually by Brisbane CPI. The toll cannot be lowered as
a result of deflation
Tolls escalate annually by Brisbane CPI. The toll cannot be lowered as
a result of deflation
Tolls escalate annually by Brisbane CPI. The toll cannot be lowered as
a result of deflation.
Tolls escalate annually by Brisbane CPI. The toll cannot be lowered as
a result of deflation
Dynamic, uncapped
495 Express Lanes³
Dynamic, uncapped
M4-M5 Link and Rozelle
Interchange¹
Tolls escalate annually by the greater of CPI or 4% to December 2040;
the greater of CPI or 0% per annum to concession end
CityLink
Tolls escalate quarterly by an equivalent of 4.25% per annum to 30
June 2029 and quarterly CPI thereafter
A25
Tolls escalate annually at Canadian CPI. Additional toll escalation
applies when peak traffic volumes (for peak tolls) or total daily traffic
volumes (for off-peak tolls) reach pre-determined thresholds
1. Assets currently under construction.
2. 95 Express Lanes concession includes the 395 Express Lanes and the Fredericksburg Extension (currently under construction).
3. 495 Express Lanes concession includes the 495 Express Lanes Northern Extension project, for which a binding proposal with the Virginia government has been accepted.
TRANSURBAN OVERVIEW | AS AT 30 JUNE 2021
40
40View entire presentation