Electricity 20 MVA capacity ERC is a licensed electricity generator and distributor with an electricity sub-station in the design phase Key Facts Operational Update A contract was signed with Canal Company to supply 20 MVA of electricity 5 electrical networks (128, 478 m) were established to serve phases 1 and 2 An approval was received to establish a 22/66 KV substation with production capacity of 100 MVA to cover phases 1 and 2 future requirements 63,207 m of power cables were installed for internal road lighting Investor Presentation FY2017 Budgeted CAPEX of EGP 180 million for a new substation (Phase 1: 50 MVA) 17