Distributed power Dynamics Population without access to the grid West Africa: ~209MM Aero East Africa: ~171MM Gas Recips Southern/Central Africa: ~196MM Weak grid/emergency capacity Drought, fuel outage & limited options • • 2.5GW installed base GE installed base * Aero Gas Country Units Units Nigeria 29 73 Angola 19 7 Other 19 63 * Consists of Gas Recips imagination at work Diesel Recips Products . 13 to 100 MW capability • Permanent and portable 1 to 4.5 MW capability Stationary... captive power • 1.2 to 3MW capability • Harsh conditions Approach Quick deployment • Limited customization / development • Pre-financed 80 GE Global Investor Day March 7, 2012