Investor Presentaiton
Victorian Otway Basin
Beach 60% and operator
FY19 production
Rest of
Beach
29.4
MMboe
Vic Otway
Basin
8.4 MMboe
FY19 2P reserves
Rest of
Beach
326
MMboe
Vic Otway
Basin
62 MMboe
FY20 Focus:
.
Black Watch and Enterprise Extended
Reach Directional (ERD) wells to be drilled
from mid-FY20
Black Watch connection will add
deliverability from H2 FY20
• Ocean Onyx semi submersible rig delivery
currently expected in March quarter 2020
• 30 day statutory shutdown at Otway Gas
Plant scheduled for March 2020
VIC/L1(V)
HBWS
Black Watch-1
beach
PPL9
RPL6
NSW
Victoria
Adelaide
Canberra
PEP 168
VIC
Melbourne
Proposed exploration well
Proposed development well
Gas pipeline
LaBella Permit
Gas field
Otway Gas-
Plant
TAS
Hobart
VIC/P42(V)
Port Campbell
Enterprise-1
0
5 10
15 km
Artisan-1
VIC/P73
La Bella
VIC/P43
Geographe-5
Geographe
Geographe-4
VIC/L23
Thylacine North-1
Thylacine West-1
Thylacine North-2
Victoria
Tasmania
T/L2
Thylacine
Thylacine West-2
T/30P
T/L3
T/30P
20
20
1. Organic 2P reserves replacement ratio calculated as Victorian Otway 2P reserves additions, excluding acquisitions and divestments, divided by FY19 Victorian Otway reported production.
Fields and Infrastructure from GPINFO and public sources
OT18-0007MView entire presentation