Investor Presentaiton
Central Dhaka - Adaptation Deficit
1. At Gulshan, Banani and Hatir Jheel Lakes - Reduce
initial water levels from 5 m PWD to 4 m PWD
2. At outfall of Panthapath Box-Culvert- Install a new
pump station with 12.5 m /s capacity and 80 %
efficiency.
3. Near Bashabo Water Pump station of DWASA-
Install new pump station and sluice gate; pump
capacity is 15 m/s, with 80% efficieny, and gate size
is 4 m x 3 m.
Extreme rainfall in 2050 Flood free 0.1m-0.25 m 0.25m-0.75m 0.75m-1.5m
> 1.5m
Average
Duration above
0.1m (hours)
Maximum flooded area (sq. km)
341mm/24 hour
Future without
Adaptation deficit
26.4
8.8
1.9
0.3
1.8
10
36.4
0.7
0.3
0.1
1.7
1
Central Dhaka - - Flood Maps with & without
Adaptation Deficit
Moha
Legend
A
a. Pl (341 mm/24 hour)
W4
Wa
Was
WAS
Kameangir Char
was
WAY
Was
b. Pl+Al (341 mm/24 hour)
Wa
Dhanmo
Kamrangir Char
Flead depth map with 341mm in 24
Legend
Flood depth
event in 2050 without climate change
neve Nast Flood depth (
Fload depth map with 341 in 2015
event in 2050 CC) and additional
Now
PSgeded in desno
08/12/2016
10View entire presentation