Investor Presentaiton
Timeline Monitoring Program
Note: Assumed that CO2-Injection could be started at the end of 2017.
20,000
15,000
Cumurative Injection (t)
(Injection rate 30t/d)
10,000
5,000
FY2017
FY2018
FY2019
FY2020
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9 10
11
12
1
2
3
4
5
6
7
0
100
200
300
400
500
600
700
800
900
1000
1100
START
3000
6000
9000 10000
12000
15000
18000
20000
STOP
M1
M2
M3
M1
M2
M3
M4
M4
M1
M2
M3
M4
Fiscal Year
Month
Time(days)
Injected CO2 (t)
Monitoring
4D VSP
<BS
Time lapse 2D Seismic
<BS
Borehole Micro-Seismic
4D TDEM
<BS
Gravity (g-Phone)
Gravity (CG-5)
<BS
Surface CO2 monitoring
InSAR
<BS
Items to be discussed
*
*
*
M1
*
*
*
*
M1
*
*
*
M2
M2
*
*
*
3
*
*
1) Is it possible to operate a DAS cable or a downhole receiver in a tubing for CO2 injection?
2) If possible, how?
3) If not possible, can the tubing be uninstalled during the VSP measurement?
*
*
*
*
M3
M3
*
M1
*
*
*
*
*
*
*
*
*
*
*
M4
ΣΙ *
M4
M2View entire presentation