Investor Presentaiton
Jupiter Mines Limited
3a Flexible Onsite and Offsite Infrastructure Capacity Allowing for a Rapid
Response to Evolving Market Conditions
Flexible production base and
logistics allow for efficient
ramp-up of production and
exports depending on market
conditions
Vertical
integration with
captive power generation
operating independently of
the national grid
■Flexibility of existing mining,
processing and
transportation contracts
Established and
export
road
efficient
infrastructure,
including an 8km private rail
siding loop, and one of the
fastest load-out stations in
the Kalahari region with
direct access to the Transnet
rail link
A history of utilising 7
terminals across 4 ports in
South Africa
Onsite Infrastructure
Transportation to
Ports
Crushing Equipment
Primary and secondary
crushing circuit with a
capacity of 3.6mtpa
Flexible Infrastructure
Product Stockpiles
Load-out Station /
Rail Loop
8km rail loop with direct access
to the Transnet Freight Rail
✓ One of the fastest load-out
stations in the Kalahari region
(4-6hr load time vs. contract
terms of 12hr)
✓ Transnet
Rail
access 1
potential to increase rail
allocation
Road
Established
trucking
relationships
allowing for flexible
road contracts
Port Elizabeth /
Ngqura
Durban
Saldanha
Cape Town
14View entire presentation