NHPC Renewable Energy and Pump Storage Project Updates slide image

NHPC Renewable Energy and Pump Storage Project Updates

NHPC - Projects in Operation एनएचपीसी NHPC 30 Installed Design Tariff NHPC Project & Year of Capital Cost S. No Capacity Energy State/UT comm. as on 31.03.23 (MW) (MU) (22-23) (Rs. /Kwh) Type of the project 1 Baira Siul, (3x60) 180 708.59 1981 311.89 2.23* Run of River (ROR) with small Himachal Pradesh (Sep) pondage 2 Loktak, (3x35) 105 448.00 1983 183.73 3.89* Storage Manipur (May) 3 Salal, (6x115) 690 3082.00 1987 1046.78 2.64 ROR UT of J&K (Nov) Tanakpur, (3x40) 94 452.19 1992 430.34 5.38 ROR Uttarakhand (Apr) 5 Chamera-1, (3x180) 540 1664.55 1994 2107.30 2.28 Storage Himachal Pradesh (Apr) 6 Uri-1, (4x120) 480 2587.38 1997 3459.33 2.37 ROR UT of J&K (Apr) 7 Rangit, (3x20) 60 338.61 2000 520.42 4.27 ROR with small pondage Sikkim (Feb) 8 Chamera-11, (3x100) 300 1499.89 2004 2027.62 2.01* 1* ROR with sm ROR with small pondage Himachal Pradesh (Feb) Dhauliganga-1, (4x70) 280 1134.69 2005 1764.61 2.70 ROR with small pondage. Uttarakhand (Oct) 10 Dulhasti, (3x130) 390 1907.00 2007 5232.07 5.15 ROR with small pondage UT of J&K (Mar)
View entire presentation