Investor Presentaiton slide image

Investor Presentaiton

Major milestones of Wärtsilä in China 2002 Integration of John Crane-Lips 2005 Wärtsilä acquired Deutz medium and high speed. engine marine service business and started to handle the business from April. Inauguration of Wärtsilä 2010 Wärtsilä China operation in Engineering Center 2007 Shanghai following global acquisition in April 2002 Propulsion (Wuxi) Co. Ltd. (wholly owned) in June set up Inauguration of 2012 Wärtsilä (Suzhou) Marine Equipment Co., Ltd became a wholly-owned Wärtsilä company through the global acquisition of Hamworthy 2011 2004 Wärtsilä-CME Zhenjiang Propeller Co. Ltd. founded in June. In the JV Wärtsilä has 55% and CME has 45% ownership 2006 Inauguration of Wärtsilä Qiyao Diesel (Shanghai) (a 50/50 JV with CSIC SMDERI to manufacture marine auxiliary engines) in June 2006 Tangzhen Service Station in March 2008 The top management of Wärtsilä Ship Power moved to China 2009 Inauguration of CPP production at Wärtsilä-CME Zhenjiang Propeller Co., Ltd. in June Inauguration of Qingdao Qiyao Wärtsilä MHI Linshan Marine Diesel Co Ltd (QMD) in April. (CSIC 50%, Wärtsilä 27% and Mitsubishi 23%) Inauguration of Wärtsilä Ship Design (Shanghai) Co. in June Zhoushan Services Station set up in Sept Signing of Strategic Cooperation Framework Agreement with CSSC in Nov 4 © Wärtsilä 7 June 2013 WÄRTSILÄ
View entire presentation