En+ Group Investment Presentation slide image

En+ Group Investment Presentation

Power Assets Overview Zone 1 (European) Prod. = 796 TWh Demand = 784TWh Zone 2 (Siberian) = Prod. 207 TWh Demand 209 TWh = Ondskaya HPP EnSer CHP Avtozavodsk CHP Abakan SPP Ust-Labinsk CHP Russia in total² Prod. 1,063TWh = Demand 1,050 TWh = ■ Siberia accounts for 20% of electricity demand in Russia ■ Coal prices and water levels are the main electricity price drivers in Siberia 1st (European) price zone 2nd (Siberian) price zone Isolated and non-pricing zones En+ Group HPPS Isolated zones (regions without wholesale market) Ust-Ilimsk HPP Bratsk HPP Boguchany HPP1 CHP-16 Ust-llyimsk CHP Novo-Ziminskaya CHP Krasnoyarsk HPP CHP-6 CHP-12 CHP-11 CHP-9 CHP-10 Novo-Irkutsk CHP Irkutsk HPP Irkutsk Electric Grid Company Outside of Russia the Company owns one CHP in Yerevan, Armenia En+ portfolio installed electricity capacity by En+ total electricity output by plant type in 2020³ plant type in 2020 SPP <1% CHP 23% 19.5 GW HPP 77% CHPS 16% Abakan SPP <1% 82.2 TWh HPPS 84% En+ Group CHPS En+ Group Solar Power Plant F Irkutsk Electric Grid Company En+ HPPs power generation in 2020³ 32% 69.3 TWh Angara cascade (incl. Irkutsk, Bratsk and Ust- Ilimsk HPPs) Yenisey cascade (KHPP) 68% Source: En+ Group, SO UPS. Notes: (1) Boguchany HPP is a 50:50 JV of UC RUSAL and RusHydro, operated by RusHydro. (2) Excluding isolated power systems and off-grid capacity. (3) Excluding Onda HPP. Ent GROUP 38
View entire presentation