Scalable, Capital Efficient Manufacturing Enables Rapid Expansion in Capacity BURLINGAME, CA ● Dedicated to Proterra Powered vehicle batteries Integrated R&D and testing center Start of production: 2017 CITY OF INDUSTRY, CA Integrated bus and battery facility © 2022 Proterra. All Rights Reserved. Each built in <12 months for <$20 million 50K sq. ft. per GWh of battery capacity Start of production: Bus 2017/ Battery 2020 BATTERY MANUFACTURING Annual battery capacity¹: O GREENVILLE, SC ● Flagship bus manufacturing facility Drivetrain and high- voltage junction box production Start of production: 2011 GREER, SC Next-generation battery facility • Drivetrain and ● ancillary component production • Start of production estimated in Q4 2022 www 1. Based on capacity of manufacturing equipment installed and does not take into account labor ~1 GWh operational in Q2 2022 Multiple GWh targeted in Q4 2022 AS & F PROTEST PROTERRA 17