OPERATIONAL PERFORMANCE BY ASSET
•
EVANDER 8 SHAFT PILLAR
Shaft tower construction between 14 and
16 Levels completed
•
Teething issues with underground
•
•
•
•
support pseudo-packs now resolved,
following delays due to COVID-19 - now
changed to dry tailings and fly ash
Production delays due to fracturing of the
shaft lining successfully repaired -
additional support installed in holing area
to prevent similar incidents
On track for feasibility study plan to
produce 30,000oz/year at an average
AISC of US$1,000/oz for the next three
years
Production cost savings result from
simplified logistics, modern underground
mining support and reduced travel times
(300m tramming distance from shaft)
Despite challenges, gold production from
Evander u/g increased by 9.1% to
12,6070z (2019: 11,5530Z)
12 crews now in place to maintain
tonnage of ~12,000 tpm (previously 9
crews, ~8,000 tpm) - to further benefit
unit costs
25 Level
Sandstone
Coal
Tillite
Dolomite
Mafic lava
Witwatersrand supergroup
18 Level
24 Level
Kimberley Reef
รอวuno
8 Shaft
15 Level
Egoli
Evander 8 Shaft pillar production
5.000
Actual
4 000
3 000
2 000
1 000
0
7 Shaft
7A Shaft
Kinross
metallurgical
plant
Sandstone
Coal
Tillite
Mafic lava
4.000
Forecast
3 000
2 000
1000
0
July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Ounces
AISC
US$/oz
20View entire presentation