Investor Presentaiton slide image

Investor Presentaiton

A Consolidated Extension Drilling MOG22-10 640 9.9m MGR-35 1,078 2.7m Consolidated Mine Stopes O O MGR-40 607 4.3m По 500m Summa Silver Corp. | TSXV:SSVR | OTCQX:SSVRF Frankfurt: 48X O O ୦୦ Consolidated Stopes 639 g/t AgEq** A' 4.7 g/t Au 264 g/tag 2200m LEGEND Hole Number 2100m 12 Drill Hole Pierce Point O MOG23-16 448 g/t AgEq* 433 23.2m 31m Intercept Length 2000m MOG22-05 448 31m O O NAVA 1900m > >500 g/t AgEq* 1800m 1700m ○ >300 g/t AgEq* >100 g/t AgEq* O No significant intervals *AgEq is calculated using US$20/oz Ag, US$1,800/oz Au, with metallurgical recoveries of Ag-90% and Au- 95%. AgEq= (Ag grade x Ag recovery)+((Au grade x Au recovery) x (Au price/ Ag price)) Holes 01 through 19 have been previously released **Historic Production Source: Blackhawk Mines corporate production records 1942 Page 9
View entire presentation