Investor Presentaiton slide image

Investor Presentaiton

Feasibility Study Overview Conservative Optimized First Five Life of Current Description Units Years Mine Production Data Conservative reserve estimate Pit design optimized for $1,400/oz gold Mine Life Years 10.5 Average Milling Throughput MMt/year 4.7 4.6 Strip Ratio waste: ore 4.2 3.4 • 5.5% mining dilution Ore Tonnage Milled Mt 23.5 48.3 Capital costs supported by: • • Q4-2021 budgetary quotes Firm pricing secured on major equipment amounting to 44% Labor costs supported by in-country labor surveys conducted in Q4-2021 Procurement strategy favors sourcing from in-country manufacturers to benefit from simplified logistics and to maximize local benefits Gold Head Grade Contained Gold Recovery Total Gold Production g/t 1.44 1.31 koz 1,086 2,036 % 90% 90% koz 981 1,834 Average Annual Gold Production koz 196 175 Operating Costs (Average LOM) Total Site Costs USD/oz $564 $565 Total Operating Costs / Cash Costs USD/oz $621 $623 AISC USD/oz $666 $681 Capital Costs Development Capital USD MM $458 Sustaining Capital USD MM $83 Financial Evaluation Gold Price Assumption USD/oz After-Tax NPV, 5% USD MM $1,600 $622 After-Tax IRR % 24% Payback Years 3.2 Note: Capital Costs shown inclusive of taxes payable. TSXV:GMIN 25
View entire presentation