INFRASTRUCTURE FOR THE FUTURE
SA POWER NETWORKS
Key Financial Drivers
Regulated Revenue
Up by 4.2%
CPI of 1.78% from 1 July 2019 (1 July 2018: CPI 1.91%)
•
X-factor applicable from 1 July 2019 was -0.85% representing a real increase in revenue before CPI
$17.7m STPIS recovery
Regulated Asset Base
Up by 1.3% (2)
Underlying Other Revenue
Down by 6.8% (4)
Underlying Operating
Costs (Excl. Enerven)
Down by 6.1% (3)
Enerven Margin
Up by 83.9%
Net Capital Expenditure
Down by 20.5%
•
Network relief package ($1.0m)
RAB increased to $4,372m
Increase driven by net capex of $306m(¹), less regulatory depreciation of $328m, and includes CPI uplift of $79m
Semi-regulated revenue: down 6.0% (4) - declining activity across all areas of asset relocation, embedded generation and council funded
replacement of public lighting
Lower staff and consultancy costs
Reduced expenditure in connection with emergency response and timing of vegetation management costs
November and December bushfire event provisions write back
Change in project mix, with projects for existing client base (including ElectraNet) complemented by new business activity including
commercial solar and battery solutions
Enerven is engaged in deploying solar and battery capability to a significant number of SA Water sites under a framework contract of
up to $300 million, predominately over 2019 and 2020
Growth capex of $62.4m, down 19.6% - network connections and augmentation
Maintenance capex of $114.7m, down 21.1%
SA Power Networks has seen RAB growth of 1.3% over the 12 months
(1) Excludes corporate overheads (2) Includes public lighting RAB (3) Excludes 2020 revaluation adjustments to employee entitlements of $0.4m positive (2019: $3.5m positive) (4) Excludes public lighting provision write
back. In 2019 a long running public lighting dispute was resolved and required amounts were settled with customers in January 2020. As a result of finalisation of the quantum of this matter, provisions of $3.5m were unwound in
1H2019.