SKIPPER HOW WE PERFORMED IN Limited Q3 2018-19 EXPECTED TRANSMISSION SYSTEM ADDITION DURING 2017-22 Transmission line As of March 2017 length(ckt. km) Addition during 2017-18 Planned addition during (till September 2017) 2017-22 Balance capacity to be added by 2022 HVDC (800/500 kV) 15,556 4,280 4,280 765 kV 31,240 2,046 27,300 25,254 400 kV 1,57,787 8,678 46,000 37,322 220 kV 1,63,268 1,627 28,000 26,173 Total 3,67,851 12,551 1,05,580 93,029 HDVC capacity (MW) +/-800 kV 5,000 3,000 14,000 11,000 +/-500 kV 13,500 Total 19,500 14,000 11,000 Substation capacity (MVA) 765 kV 1,67,500 10,000 1,14,000 1,04,000 400 kV 2,40,807 20,445 1,03,000 82,555 220 kV 3,12,958 8,620 75,000 66,380 Total 7,21,265 39,065 2,92,000 2,52,935 Source: Central Electricity Authority 35