Skipper India Expansion and Performance
SKIPPER HOW WE PERFORMED IN
Limited
Q3 2018-19
EXPECTED TRANSMISSION SYSTEM ADDITION DURING 2017-22
Transmission line
As of March 2017
length(ckt. km)
Addition during 2017-18 Planned addition during
(till September 2017)
2017-22
Balance capacity to be
added by 2022
HVDC (800/500 kV)
15,556
4,280
4,280
765 kV
31,240
2,046
27,300
25,254
400 kV
1,57,787
8,678
46,000
37,322
220 kV
1,63,268
1,627
28,000
26,173
Total
3,67,851
12,551
1,05,580
93,029
HDVC capacity (MW)
+/-800 kV
5,000
3,000
14,000
11,000
+/-500 kV
13,500
Total
19,500
14,000
11,000
Substation capacity (MVA)
765 kV
1,67,500
10,000
1,14,000
1,04,000
400 kV
2,40,807
20,445
1,03,000
82,555
220 kV
3,12,958
8,620
75,000
66,380
Total
7,21,265
39,065
2,92,000
2,52,935
Source: Central Electricity Authority