Investors' Presentation

EDPR portfolio increased to 13.0 GW, +2.5 GW added YoY Generation +5% YoY due to higher capacity despite low wind resource Installed Capacity YoY (EBITDA + Equity MW) 9M20 11,548 MW Added 2,467 14,014 Asset rotation Spain (1) US (2) (965) 9M21 55% 40% 5% 0.2% 2.7 GW Net Capacity Factor 9M21 (%) Electricity Production YoY (TWh) NCF ΔΥΟΥ 9M20 20.4 25% A MW 30% -1pp 41% +5pp A Load Factor 13,049 edp 28% 9M21 -0.6pp renewables Under Construction 12 1. Spain: 237 MW + 11 MW 2. US: 324 MW net (80%) + 290 MW net (80%) + 102 MW B&T 58% 37% 6% 95% flat YoY 97% +0.1pp YoY GCF vs P50 TEA 13mt CO2 emissions avoided 1.5 (0.4) edp renewables 21.5 +5% YoY 37