Investor Presentaiton slide image

Investor Presentaiton

Key Infrastructure (3/5) The Tabang infrastructure has been designed to allow flexibility and build in redundancy Key Assets Overview Intermediate Crushing Facility / Coal Pads Barge Transhipment Facilities 13 Interme- diate Crushing Facility / Coal Pads Coal mined is trucked to the Intermediate Crushing Facility or ROM Pads located 2 - 7 km from mine Coal is stockpiled, crushed (in the case of the ICF and ROM pad 2) and reloaded onto: (1) 75 ton trucks and transported to barge loading facility at Gunung Sari Jetty, or (2) between 200 to 220 tonne trucks and transported to barge loading facility at Senyiur Jetty ICF: 2,000 tph crushing capacity, stockpile capacity of 650 kt for ROM and 700 kt crushed coal āœ“ Coal pad 2: ROM coal stockpile capacity of 550 kt; 2 x 1,500 mt/hr screening and crushing lines and 10x Truck Loading hoppers Coal pad 3: stockpile capacity of 200 kt; Barge Tran- shipment Facilities The Company operates 3 barge transhipment facilities (combined 3,750 tph) at the confluence points of the Mahakam and the Belayan / Kedang Kepala Rivers Total capacity of approximately 15 million tonnes per annum These facilities are used to tranship coal from smaller barges to larger barges or top up partially loaded barges PT BAYAN RESOURCES Tbk.
View entire presentation