Investor Presentaiton
Key Infrastructure (3/5)
The Tabang infrastructure has been designed to allow flexibility and build in redundancy
Key Assets
Overview
Intermediate
Crushing
Facility / Coal
Pads
Barge
Transhipment
Facilities
13
Interme-
diate
Crushing
Facility /
Coal Pads
Coal mined is trucked to the Intermediate Crushing
Facility or ROM Pads located 2 - 7 km from mine
Coal is stockpiled, crushed (in the case of the ICF and
ROM pad 2) and reloaded onto: (1) 75 ton trucks and
transported to barge loading facility at Gunung Sari Jetty,
or (2) between 200 to 220 tonne trucks and transported to
barge loading facility at Senyiur Jetty
ICF: 2,000 tph crushing capacity, stockpile capacity of 650
kt for ROM and 700 kt crushed coal
ā Coal pad 2: ROM coal stockpile capacity of 550 kt; 2 x
1,500 mt/hr screening and crushing lines and 10x Truck
Loading hoppers
Coal pad 3: stockpile capacity of 200 kt;
Barge
Tran-
shipment
Facilities
The Company operates 3 barge transhipment facilities
(combined 3,750 tph) at the confluence points of the
Mahakam and the Belayan / Kedang Kepala Rivers
Total capacity of approximately 15 million tonnes per
annum
These facilities are used to tranship coal from smaller
barges to larger barges or top up partially loaded barges
PT BAYAN RESOURCES Tbk.View entire presentation