Five-Year Plan and Financial Outlook
Core E&P Business Update
Assets Transition in Thailand
PTTEP
G1/61
(Erawan)
Delayed
Site Access
YY
Starting producing
below PSC volume
Remediation Plan
(accelerate ramp-up and
uplift other fields)
On track towards 1st gas in 2022
G2/61
(Bongkot)
WHP Construction
IIII
Awarded
drilling rig
(ready to drill in Nov)
GSA Finalized
Stronger foothold in Malaysia
SK410B Project
• Under field development study reflecting
larger gas discovery volume and CO2
management as per GHG aspiration target
• FID target on track
• Several petroleum prospects under study
with additional drilling planned in 2022
SK438 Project
Evaluating petroleum potential at Mak
Yong-1, after gas discovery at Kulintang-1
(1st exploration well) in April 2021
PM407 Project
Conducting 3D Seismic Reprocessing
and preparing for exploration drilling
campaign in 2022-2023
Potential Development Cluster in Sarawak, Malaysia
and Installation
(complete in Nov)
Production boost in Oman
Oman Block 61
Ramp up production to full
capacity from 27 June 2021
• Gas: 1,500 MMSCFD
Condensate: 69,000 BBL/D
New volume in Algeria
Algeria HBR
Construction and commissioning
on progress
1st oil production expected in
2H/2021 with capacity 10-13KBPD
OMAN
14
Thailand
Legend
Producing
Explorations
Petroleum Discoveries
South Sarawak Cluster
SK309-311, SK314A, SK438, SK405B
Bongkot
Arthit
PM415
Peninsular
PM407
North Sarawak Cluster
SK410B & SK417
ISK410B - SK417
Block H
PFLNG2
Block K
Sabah
SK438
SK314A
SK405B
SK309/311
MLNG
complex
SarawakView entire presentation