Path to Production - Indicative Schedule
GUILDFORD
PROJECT/Activity
HUGHENDEN - Un der grou nd
Drilling
In dep end ent Geological Report
Conceptual Mine Design and Analysis
Pre-fe asi bil it y Assessment
Feasibility Assessment
EIS/Development Con se nt/Mining Lease
HUGHENDEN - Open Cut
Drilling
In dep end ent Geological Report
Conceptual Mine Design and Analysis
Pre-fe asi bil it y A sse ss ment
Feasibility Assessment
EIS/Development Con se nt/Min in g Lease
MARY BOROUGH
Drilling
In dep end ent Geological Report
Conceptual Mine Design and Analysis
Pre-fe asi bil it y Assessment
Feasibility Assessment
EIS/Development Con se nt/Mining Lease
SIE RRA
Drilling
In dep end ent Geological Report
Conceptual Mine Design and Analysis
Pre-fe asi bil it y Assessment
Feasibility Assessment
EIS/Development Con se nt/Min in g Lease
MO NTO
Drilling
In dep end ent Geological Report
Conceptu al Mine Design and Analysis
Pre-fe asi bil it y A sse ss ment
Feasibility Assessment
EIS/Development Con se nt/Min in g Lease
SUNRISE
Drilling
In dep end ent Geological Report
Conceptual Mine Design and Analysis
Pre-fe asi bil it y A sse ss ment
Feasibility Assessment
EIS/Development Con se nt/Mining Lease
Not es
Q
GUILDFORD COAL PROJECT PLAN - JULY 2010
2010
2011
2012
Jul
Aug
Sep Oct N ov
Dec
Jan
Fe b Mar
Apr May Jun
Jul Aug Sep Oct Nov Dec
Jan
Feb
Mar
Apr
May Jun
Jul Aug
Se p Oct
Nov Dec
Scout Open Hole Drilling to confir m
JORC
Targeted Open Hole Drilling with so me Partial C or ing
JO RC
Targeted Open Hole Drilling and Core d Hole Drilling
JORC
Concept
JORC
JORC
Targeted O pen Hole
JORC
Targeted Open Hole Drilling with so me Partial C or ing
JOR C
Concept
Commence EIS
JORC
Pre-Feasibility
Targe ted Open/Core
JORC
Targeted Open Hole Drilling and Partial Co ring
JORC
JOR C
Concept
Pre fe asibility
Wet Se aso n
Commence E IS
Targeted Open Hole Drilling and Co red Hole Drilling
JORC
Concept
Commence EIS
Assumes Comet EP Ca19 76, Ne bo EPCa 1608, Hail Creek North EPC a215 8 and Pentland EP Ca16 41 has not been granted in favour of Guildford within the timeframe
Assumes all ungranted tenements are granted in the timeframe fo reca st
Assumes identified potential coa Itarget sa re confirmed with drilling
Assumes confirmed coa Itargets justify eva lua tion through to feasibility
14
Full Feasibility
Obtain Mining Le ase
Full Feasibility
Obtain Mining Lease
JORC
Targete d O pen Hole Drilling and Core d Hole Drilling
JORC
Pre-Feasibility
Wet Season
Scout Open Hole Drilling
Scout Open and Partial Core Hole Drilling
JORC
JO RC
Guildford Coal