Further Growth Opportunities
Operating assets review (4/4)
Asset
Mine
Capacity Grade
(Ktpa)
milled
grade
(g/t) (g/t
Reserve 2017A
output
(koz)
Outlook
Khakanja UG 600
6.1
5.3
110
> Full depletion of the
reserves (200 Koz)
in 2019
Svetloye OP 1,000
4.4
2.8
107
▲ POLYMETAL
INTERNATIONAL PLC
Priorities
AISC
$/oz
(2017E)
> Gradual decline in
grade and
production
> Continued exploration at smaller high-
grade satellite deposits potentially
providing feedstock at Khakanja
> Evaluation of strategic options for the
Khakanja plant and associated smaller
deposits
640-
670
> Stable production at
low costs for the
next 7-8 years
> De-bottlenecking heap leach stacking
capacity given significant expansion in
ore reserves following positive grade
reconciliation after in-fill drilling and
positive exploration results on the
flanks
| 38View entire presentation