AltaGas Value Proposition
Canadian LNG Developments Drive Adjacent Opportunities
LNG
CANADA
Project Summary
$48B Phase 1 LNG export
facility in Kitimat, BC with
an expected 2025 in-
service date.
Export Capacity
Phase 1
14 mmtpa
Phase 2:
+14 mmtpa
Associated LPGs¹
(Propane/Butane)
Liquids Per Phase
~50 Mbbl/d
20-25 Mbbl/d
$6.4B LNG export facility
7-8 Mbbl/d
Woodfibre
LNG
in Squamish, BC with an
2.1 mmtpa
expected 2027 in-service
date.
3.5 Mbbl/d
KSI LISIMS LNG
$8.7B floating LNG export
facility in Gingolx, BC with
an expected 2027-2028
in-service date.
•
Others
(Cedar, Tilbury I/II)
$3B Cedar LNG (2027+, Haisla Nation, Pembina)
•
$0.6B Tilbury LNG 1B Expansion (2026, Fortis)
•
$3.3B Tilbury LNG Phase 2 (2027+, Fortis)
Notes: 1) Associated Liquids yields from representative liquids rich Montney deep-cut gas processing plants. * See "Forward-looking information"
AltaGas
Canadian LNG Provide Structural Tailwinds
40-45 Mbbl/d
12 mmtpa
18-22 Mbbl/d
6.2 mmtpa
20-24 Mbbl/d
9-11 Mbbl/d