THE ROSE PROJECT: MINE & CONCENTRATOR OPEX details (1) Operating costs per tonne processed Mining ($4.56 per tonne) Processing G&A Transportation (FOB Port) CriticalElements Lithium Corporation C$96.73 $37.89 $19.88 $20.30 $18.66 C$/t Li,O Concentrate US$/t Li₂O Concentrate Operating costs per tonne of concentrate Mining 701 540 274 211 Processing 144 111 General & Administration 147 113 Transportation 135 104 Total Operating Costs 701 540 SG&A 35 27 Royalties 30 23 Total Operating Costs (w. SG&A & Royalties) Less Tantalite Credit 766 590 52 Total Operating Costs (after tantalite credit) 714 40 550 Source: Critical Elements Lithium Corporation - NI 43-101 Technical Report on Rose Lithium-Tantalum project feasibility study dated July 26, 2022 (1) Dollar figures in Canadian dollars unless otherwise stated; feasibility study assumes exchange rate of US$0.77/C$ TSX-V:CRE 16