PERU LNG 2021 Annual Report
ANNUAL REPORT
PERU LNG 2021
During 2021, PERU LNG carried out an internal
audit of Pipeline Integrity Management System
with an external consultant, which concluded
that the system meets 100% of the requirements
contained in the Regulation for the Carriage
of Hydrocarbons through Pipelines approved
by Supreme Decree 081-2007-EM and ASME
B31.8S standard.
We also successfully completed the installation
and commissioning of a pilot project using a
1,8 KW Stirling-engine-driven generator at
the pig launcher and reception station (AREA
300), which consumes less gas, requires less
maintenance and is more reliable than the
generators currently in use along the rest of the
pipeline.
The year also saw an update of the remote
operations controllers (ROC) at the metering
stations (AREA 200) and pressure control
stations (AREA 400), and painting of the above-
ground structure at the metering station (AREA
200) and main valve station (MLV 01).
All of this work was carried out under close
supervision by Ayacucho Operations personnel
and completed on time and in budget.
m s. n. m.
5000
4500
4000
3500
3000 ..
2500
2000
1500
1000 ..
PERFIL DE RUTA DEL GASODUCTO
CHAPTER 5
INFRASTRUCTURE TO ASTOUND THE
WORLD
500.
0.
0
50 000
100 000
150 000 200 000
250 000
300 000
350 000
400 000
RECORRIDO DEL GASODUCTO (m)
23View entire presentation