Perama Hill Project Overview slide image

Perama Hill Project Overview

• Lamaque Complex Growth Plan Our growth plan entails staged mine development and resource conversion Gold Production for the Upper Triangle Reserve Case Significant growth since acquisition Actual and planned production exceeds 2018 PFS Extended mine life with -5.5 years of production from Upper Triangle reserves, and potential for an additional ~8 years of mine life from Lower Triangle and Ormaque inferred resources Gold Production (oz) 250,000 200,000 150,000 100,000 50,000 0 2018 Reserve Cases (Upper Triangle) ■ 2018 PFS 2019 2020 2021 2022 2023 Planned Production (Reserves) 2024 2025 2026 2027 Actual Production Budget Case (Upper Triangle) 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Mining Plan Development | 2033 | 2034 Upper Triangle Reserve Case Lower Triangle PEA Ormaque PEA Parallel Reserve Case Resource Conversion Plan eldorado gold C10 Commence Mining Ormaque The PEAS are preliminary in nature and are based on numerous assumptions and the incorporation of Inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the PEA will be realized. There is no guarantee that Inferred mineral resources can be converted to Indicated or Measured mineral resources and, as such, there is no guarantee that the economics described herein will be achieved. Mineral resources that are not mineral reserves do not have demonstrated economic viability. 17
View entire presentation