Electrifying the Future slide image

Electrifying the Future

ELECTRIFYING THE FUTURE Discretionary Capital Projects* Kucing Liar Commenced long-term mine development activities Approximate 10-year development timeframe ⚫ Sustain large-scale, low-cost Cu/Au production Capital investment: ~$400 mm/yr average (~$200 mm in 2022e) > 6 bn lbs copper & 5 mm ozs gold - 600 mm lbs & 500K ozs per annum Lone Star Oxide Expansion Low capital intensity investment Capital investment: ~$250 mm (~$100 mm in 2022e) • Increase stacking rate: 95k t/d to 120k t/d Targeting 300 mm lbs of copper/annum by 2023e +50 mm lbs/yr of incremental production Grasberg Mill Recovery Project Installing new copper cleaner circuit FREEPORT FOREMOST IN COPPER • Improved Cu concentrate grades/metal recoveries Capital investment: ~$420 mm (~$200 mm in 2022e) Targeted completion: 1H24e +60 mm lbs/yr & +40K ozs/yr of incremental metal Atlantic Copper Circular Recycle electronic material ⚫ Capital investment: ~$320 mm (~$70 mm in 2022e) Expect to commission in 2024e; full rates in 2025e • ~$60 mm per annum in incremental EBITDA Bagdad Expansion • Early works and equipment: ~$100 mm (~$75 mm in 2023e) *These discretionary projects and the Indonesia smelter projects will be excluded from the free cash flow calculation for purposes of the performance-based payout framework. e = estimate. See Cautionary Statement. 27
View entire presentation