Investor Presentaiton slide image

Investor Presentaiton

Significant Intercepts Run the Entire Strike Length Foundation intercepts at Kobada reflect the forgotten value in the asset 545000mE . Initial discovery drilling intersected shallow, high grade oxide mineralisation • • Excellent drill results in each phase of drilling along entire strike length of Kobada Main Deposit ~150,000m have since been drilled to an average depth of ~110m • Combination of RC and DD drilling Note: Refer to the Company's announcement dated 31 May 2023. 1290000mN 1287500mN 5km DFS Pit Crest KBRC11-001 2m @ 44.6 g/t Au KBRC11-008 3m @ 42.5 g/t Au KB20_PH4A_6 [email protected] g/t Au KBRC12-006 44m @ 1.82 g/t Au KBRC12-066 9m @ 21.0 g/t Au KB07-16 19.5m @ 4.14 g/t Au KBRC09-05 11m @ 11.3 g/t Au KBRC12-160 4m @ 35.8 g/t Au Kobada Shear KBRC11-164 5m @ 17.2 g/t Au KB07-97 5m @ 2.89 g/t Au KBRC12-227 547500mE 5m @ 25.8 g/t Au KB20 PH4A 16 2m @ 34.9 g/t Au KB19 P2 41 5.4m @ 19.4 g/t Au KBRC11-189 60m @ 3.10 g/t Au KBRC9-20 15m @ 6.70 g/t Au KBD02 22m @ 6.93 g/t Au KBRC12-084 56m @ 2.86 g/t Au KBRC056 25m @ 8.41 g/t Au KB19_P2_04 3m @ 33.9 g/t Au Kobada Main Resource KBRC11-088 2m @ 52.2 g/t Au TOUBANI RESOURCES KB07-95 1.5m @ 19.0 g/t Au >= 50 Au grams x metres 10-50 Au grams x metres 5 10 Au grams x metres <=5 Au grams x metres Selected historical о drillholes 0 1km Resource outline 14
View entire presentation