Investor Presentaiton
Tumblegum South Prospect - Mineral Resource Estimate
Northwest
BGRC039
BGRC038
7m @ 3.36g/t Au,
0.11% Cu
2m @ 3.70g/t Au
10m @ 2.59g/t Au,
0.10% Cu
450mRL
1m @ 1.58g/t Au
1m @ 13.43g/t Au,
0.51% Cu
400mRL
350mRL
2019 drilling
BGRC008
Southeast
surface
BGRC024
BGRC036
BGRC009
GRC1157
7m @ 3.28g/t Au,
0.13% Cu
45m
1m @ 4.21g/t Au,
0.81% Cu
6m @ 0.41g/t Au
1m @ 1.26g/t Au
72m
72m
1m (EOH) @ 0.63g/t Au
90m
open
5m @ 0.66g/t Au
109m
115m
5m @ 3.81g/t Au,
0.28% Cu
open
?
2m @ 2.03g/t Au,
0.32% Cu
---
(prefix BGRC)
2013/2017 drilling
198m
Mineralised intercept
Mineralised zone
Thrust fault
?
Conceptual Thrust Fault
50 metres
BRYAH RESOURCES
LIMITED
GABANINTHA PROJECT
TUMBLEGUM SOUTH PROSPECT
DRILL SECTION B - B'
•
•
.
•
Inferred Mineral Resource (JORC Code
2012) announced in January 2020:
•
600,000t @ 2.2g/t Au for 42,500 oz
(0.3 g/t Au cut-off)
Gold mineralisation occurs in 5 lodes
Lodes are shallow (from surface and
<100m depth), open down dip and along
strike
Preliminary mining optimisation work
indicates resource could be amenable to
open pit mining and treating through a
nearby gold plant, based on industry
standard costs
As Tumblegum South is an isolated
tenement, plan is to monetise/jointly
commercialise the tenement
Negotiations remain on-going with
interested partiesView entire presentation