Investor Presentaiton
Technologically Resilient HSBB Network
Link Net has Already Completed Most of Its End-to-End Network Infrastructure, Assuring Network Quality and Reducing Future Investment Requirement
International Gateway
Inter-city Connection
Intra-city Connection
Vertically Integrated End-to-end Network Infrastructure
3 international fiber lines /
submarine cables providing
bandwidth to Singapore
B2JS
JSSC
MCS
Ultimate Java Backbone
(connecting 45 Cities)
Jakarta - Merak Cable
Last Mile Roll-out
34,724 km of cable network(b)
Surabaya Denpasar Cable System
Jakarta Surabaya Submarine Cable
(planned)
100% proprietary intra-city
connection in all of the operating
cities
Substantially self-owned last mile roll-
out(c)
Note:
a) Link Net acquired a 15-year right to use the Ultimate-Java backbone in 2017
b) Total cable length includes HFC and FTTH as of December 2021
c) Limited exceptions for certain last mile owned by property developers
linknet
Selective Usage of Third-Party Network for Quality
www.linknet.id | FY21 Company Presentation 15View entire presentation