Investor Presentaiton
Production
Solan P3: near-term production growth
■ Successful horizontal well on-stream on 15 September
- 2,340 feet of net sand encountered vs 2,150 feet forecast
Positive signs of connectivity to water injector pressure support
- Reservoir properties at higher end of expectations
■ Free-flowed at rates of up to 9.5 kbopd
Production choked back to minimise excess flaring while
the fuel gas and power system were recommissioned
■ P3, with the ESP online, expected to reach rates of in
excess of 10 kbopd shortly
-8400
-8320
-8240
-8160
-8080
PremierOil
720
800
880
960
1040
1120
1200
1280
1360
1440
1520
1600
1680
1760
1840
9250.00
9500.00-
9750.00 10000.00 $10250.00-
10500.00
9500.00
10750.00-
??
C.100ft AVT
sandstone in
pilot hole
975800-0
Shallow reservoir entry
+0000.00
10250.00-
vs prognosis provides
additional sandstone
Long section of near
featureless massive
sandstone with high
porosity and permeability
11000.00
Incremental 500ft of high
quality reservoir added
beyond planned TD
11000
11500.00-
11750.00-
12000/00-
12250.00-
Upr Solan
??
11500.00-
720
800
880
960
1040
1120
1200
1280
1360
1440
1520
1600
1680
1760
1840
November 2020
-8080
-8160
-8240
-8320
-8400
P12View entire presentation