Processing Highlights
Lithium is weakly bound to the clays
>90% leach extraction within 10 minutes - fast tracking to production
Highest extractions >97% - overall post-leach recoveries ~ 90%
>99% lithium carbonate purity on first precipitation; can be
economically upgraded to battery grade carbonate or hydroxide
Potential MgSO4 fertilizer by-product
Property Features
Low Deleterious Elements
•
Low mercury, arsenic, radioactivity (uranium)
No Water Issues
•
Resource above the water table, no runoff or watershed issues
• Water rights secured
Legend
2022 Core Drill Holes
2022 RC Drill Holes
2022 Sonic Drill Holes
2021 RC Drill Holes
2020 RC Drill Holes
2020 Sonic Drill Holes
2019 RC Drill Holes
2019 Core Drill Holes
West End Claims
NAD 2000
TLC Property Boundary
(50626H/12510.0 Acres)
Resource-Measured
Resource-Indicated
Resource-Inferred
and pit crest
4000
AMERICAN
ANTHIUM
TLC Project
All Drill Holes
Entire property + Resource Outline
Explanation
Project Area (4.665 acres)
-Existing Road
- Access Road
Proposed Activities
Dill Sites (110)
⚫ VWP Web
Grandwater Montering Walk
Constructed Roads 16,223 feet)
Overland Travel (70.005 feet)
Bulk Sample Test Pits (5)
Stockpiles (5)
Oleging Arcas (3)
Laydown Ares (1)
BUREAU OF LAND MANAGEMENT
TLC EXPLORATION PROJECT
Locations of Proposed Activities
within the Project Area
Figure 2.1.1
Minimal Overburden
•
Mineralization close to surface - deepest pit depth 350 feet
Simple Lithium Upgrading
Gravity separation upgrades lithium - 1300 2200 ppm
0.5
11.02/2021
BLM Exploration Plan of Operations
No Endangered Plants or Species