En+ Group Investment Presentation

Power Segment's Modernisation Programs CHP modernisation program • • The Group participated in the state programs for CHP modernisation providing guaranteed return on investment¹ Capacity Allocation Contracts to be signed between buyers, market regulator (ATS) and generating companies of the wholesale market, providing with the key criteria for modernisation, parameters of capacity supply after the modernisation and return on investment. Through this program the Group will improve reliability and safety of 1,445 MW of its CHP capacity (33.5% of total CHP capacity) • In addition to electricity, the Group's CHPs provide critical heat generation for local population in Siberia Projects Segozerskaya HPP, small-scale Total CHP projects Commence of capacity supply Capacity, MW CAPEX² USD mn 01.12.2022 8.1 19.7 1,445 229.7 Novo-Irkutsk CHP Turbine 3 01.01.2023 175 23.3 Turbine 4 01.12.2025 175 41.9 No new CHP capacity to be constructed CHP-10 • Total expected CAPEX for CHPs of USD 229.7 mn (RUB 16.6 bn) in 2020-2026 Turbine 2 01.01.2023 150 16.3 Small HPP project Turbine 7 01.05.2024 150 16.3 As a part of the state program backed by CAC mechanism for renewable projects, En+ Group is implementing a small-scale Segozerskaya HPP (8.1 MW) in Karelia (Russia) Turbine 5 01.12.2025 150 17.0 En+ Group formed a portfolio of projects with a total installed capacity of about 200 MW. Depending on the results of the project feasibility study, a decision will be made on when these projects will be implemented Turbine 8 01.01.2024 150 16.3 Turbine 4 01.12.2026 150 19.8 Schedule of CAPEX for CHPS modernisation and small-scale HPP Total estimated budget – c. USD 249 mn CHP-11 (Turbine 3) 01.01.2024 50 8.7 25% 23% CHP-9 (Turbine 6) CHP-6 (Turbine 1) 01.01.2024 01.08.2022 65 65 60 14.1 18.1 21% 14% 12% 3% Ust-Ilimsk CHP (Turbine 3) 01.05.2025 110 17.7 2% Avtozavodskaya CHP (Turbine 9) 01.04.2025 60 60 20.1 2020 2021 2022 2023 2024 2025 2026 Note: Due to rounding, total may not correspond with the sum of the separate figures. (1) The Group participated in the Competitive Capacity Auction (CCA) Modernisation Program providing with return on investment through Capacity Allocation Contracts (CAC). (2) Calculated based on USD/RUB exchange rate 72.37 as of 30.06.2021. Ent GROUP 51
View entire presentation