Community Solar Deployment and Subscriptions slide image

Community Solar Deployment and Subscriptions

Cumulative MWac 800 600 400 Massachusetts SMART Program Contributes 560 MWac - 64% of State's Community Solar Cumulative Deployment Community Solar Capacity Installed in Massachusetts (MWac) Operational Planned 623 825 858 880 200 338 455 249 248 0 2017 2018 2019 2020 2021 2022 2023-H1 Planned In 2018, Massachusetts started the Solar Massachusetts Renewable Target (SMART) Program (after the Solar Carve-Out II Program closed in 2017). By 2023 H1, 880 MWac of community solar projects were in operation. 560 MWac installed via the SMART program, contributing 64% of the community solar installation in Massachusetts. 248 MWac planned under SMART. Community solar annual installations have dropped since 2022. 55 MWac installed since 2021. Growth rates in 2020-2021, 2021- 2022 are 32% and 4%, respectively. Data Source: 2015-2020: Sharing the Sun Project List 2022; Planned*: Solar Massachusetts Renewable Target (SMART) Application Update SMART projects only. The "planned" status includes approval/pending/under construction. The darker blue categorized as the cumulative AC output (MW) for community solar in operation by the corresponding year in Massachusetts. The light blue represents the AC output (MW) of planned (qualified) community solar projects to be installed in 2023 H1 and thereafter. Projects "under review" and "waitlist" were not included. NREL 22
View entire presentation