Equatorial Guinea: 2018 Work Program
KOSMOS
Activities focused on maximizing existing resource value and finding new resources, with
2018 work program enabling 2019 tie-back focused drilling
ENERGY.
Maximizing Value of Existing Resource¹
80
70
60
Enhanced
Production
50
Tie
40
Back
Potential
30
20
10
0
2017
2018
Previous Operator
2019
2020
2021
2022
Maximizing
Value
Of Existing
Resource
Finding New
Resource
1. Illustrative production profile
2. ESP installations expected to generate > 100% rate of return
2023
2024
2025
2026
Kosmos/Trident
Further Value
Enhancement
Decreased ARO via:
Optimized work scope
Cost deflation
Lower NPV from higher
discounting due to field life
extension
With Exploration Success
2027
2028
2029
Extended Field Life
2030
1H:18
2H:18
Existing well optimization
50 km
40 miles
Gulf of Guinea
Finding New Resource
BLOCK
W
EG-21
Okume
Ceiba
BLOCK
S
3D seismic
survey
EQUATORIAL
GUINEA
1H:19
2H:19
2020+
Waterflood Optimization
Phase 1 ESP installation²
Acquire 3D Seismic over
Blocks W, S, EG-21
Process acquired 3D
seismic
Infield / Near Field: Short
Cycle Tie Backs
Large, standalone
Prospects