Our production plans for 2022 and 2023 assume growing production and sales volumes Available nameplate capacity, volume produced, volume sold (2021) [MW] Capacity EOY 1.000 Volume produced 500 400 Volume sold 1.400 1.350 30 20 2021 2022E 2023E ☑ MEYER BURGER 1.4 GW of capacity on the way • • 1 GW cell nameplate capacity in Thalheim, Germany will become available in 2022, synchronized with growing module capacity 1 GW module nameplate capacity will become available in Freiberg, Germany in Q4 2022. At this production level, a positive operating result is expected to be achieved on a run- rate basis 0.4 GW module capacity in Goodyear, Arizona in preparation and will become available in 2023 Due to ongoing ramp-up to 1 GW nameplate capacity in Freiberg, expected production volume is 0.5 GW in 2022 and 1.35 GW in 2023 Inventory effects lead to slightly lower sales than production volumes in each of the respective years. In 2021, only constraint on volume sold was the delayed ramp-up Meyer Burger Technology AG, Presentation for Investors, Analysts and Media, March 24, 2022 24
View entire presentation