Meyer Burger Investor Presentation
Our production plans for 2022 and 2023 assume growing
production and sales volumes
Available nameplate capacity, volume produced, volume sold
(2021) [MW]
Capacity
EOY
1.000
Volume
produced
500
400
Volume
sold
1.400
1.350
30
20
2021
2022E
2023E
☑ MEYER BURGER
1.4 GW of capacity on the way
•
•
1 GW cell nameplate capacity in Thalheim, Germany will
become available in 2022, synchronized with growing
module capacity
1 GW module nameplate capacity will become available in
Freiberg, Germany in Q4 2022. At this production level, a
positive operating result is expected to be achieved on a run-
rate basis
0.4 GW module capacity in Goodyear, Arizona in
preparation and will become available in 2023
Due to ongoing ramp-up to 1 GW nameplate capacity in
Freiberg, expected production volume is 0.5 GW in 2022
and 1.35 GW in 2023
Inventory effects lead to slightly lower sales than production
volumes in each of the respective years. In 2021, only
constraint on volume sold was the delayed ramp-up
Meyer Burger Technology AG, Presentation for Investors, Analysts and Media, March 24, 2022