Thailand Energy Market & PTTEP Business Update
E&P Portfolio | Thailand, Myanmar, Malaysia
Myanmar
Production
Zawtika (WI 80%)
• Production Volume gas 326 MMSCFD (12M2022)
Yadana (WI 37.1%)
• Production Volume gas 734 MMSCFD (12M2022)
Exploration
M3 (WI 100%)
• Pending development
Malaysia
Production
Block K (WI Kikeh 56%, SNP 22.4%, GK 7.2%)
• Production Volume crude 27 KBPD and gas 26 MMSCFD
(12M2022)
Block H (WI Rotan 56%, Others 42%)
• Production Volume gas 270 MMSCFD (12M2022)
SK309 and SK311 (WI 42-59.5%)
Including East Patricia field
• Production Volume gas 214 MMSCFD, and crude 16 KBPD
(12M2022)
Exploration
• SK410B (LLB), SK417, SK314A, SK438, SK405B
• PM415, PM407
PTTEP
Thailand
Myanmar
S1
Sinphuhom
E5
M3
Thailand
Yadana
Zawtika
B8/32 & 9A
MD7
G1/61 (Erawan)
Arthit
Contract 4
Bongkot & G2/61
MTJDA
Sabah H
Sabah K
SK410B SK417
Malaysia
SK438
PM415
SK405B
PM407
SK314A
SK309&
SK311
Production
G1/61 Erawan (WI 60%)
• FY2022 daily gas production 210 MMSCFD
Ramp-up in progress to 800 MMSCFD in Apr 2024
• Sole investment 100%
G2/61 Bongkot (WI 100%)
• Block B15 Transition completed.
⚫ Block B16 and Block B17 will be transferred in March 2023
with a production target ramping up from 200 to 700 MMSCFD.
Bongkot (WI 66.67%)
• Production volume gas 715 MMSCFD and condensate
19 KBPD (12M2022)
• Remaining transition Block B16 and B17 to G2/61 in Mar
2023 at 500 MMSCFD
Arthit (WI 80%)
• Production Volume gas 304 MMSCFD and condensate
16 KBPD (12M2022)
Contract 4 (WI 60%)
• Production Volume gas 417 MMSCFD and condensate
16 KBPD (12M2022)
S1 (WI 100%)
• Production Volume crude oil 26 KBPD (12M2022)
MTJDA (WI 50%)
• Production Volume gas 300 MMSCFD (12M2022)
Supplying to Thailand at least 30 MMSCFD
Production
Exploration
28View entire presentation