Investor Presentaiton slide image

Investor Presentaiton

Division of RES Support ◉ RES support in BIH is divided by: 。 RES capacity that is supported, on: Support for large installations*, and Support for small installations 。 Type of support, on: • Direct support (FIP, FIT and tax rebates), and Indirect support (participation in balancing costs, priority dispatching, network connection costs, etc.) ○ Allocation support methods, on: Auction (open or site specific auctions), and Administrative (based on expert estimation) Proposed support schemes are combination of these variants * → Threshold between large and small installations differ by RES technologies to be defined Page 8 12 June 2019 | Reform of the Renewable Energy Support Scheme System in Bosnia and Herzegovina giz
View entire presentation