Production outlook - supplementary guidance Copper² Units 2019 2020 2021 H1 2022 2022F 2023F 2024F Chile: 560-600 Chile: 590-650 Chile: 590-650 kt 638 647 647 273 Peru: 100-150 Peru: 320-370 Peru: 320-370 Platinum Group Metals - M&C by metal4 Moz 4.4 Pt: 1.8 Pd: 1.2 Other: 0.8 Pt: 1.99 Pd: 1.35 Other: 0.96 Pt: 0.92 Pd: 0.62 Other: 0.45 Pt: 1.8-2.0 Pd: 1.2-1.3 Other: 0.9-1.0 Pt: 1.9-2.1 Pd: 1.3-1.4 Other: 0.9-1.0 Pt: 1.9-2.1 Pd: 1.3-1.4 Other: 0.9-1.0 Platinum Group Metals - Refined Moz 4.7 2.7 5.1 1.96 4.0-4.4 3.8-4.2 4.1-4.5 Iron ore (Kumba)³ Iron ore (Minas-Rio)9 Mt 43 38 41 17.8 38-40 39-41 41-43 Mt 23 24 23 9.8 22-24 25-27 26-28 Production on a 100% basis except for the Gahcho Kué joint operation, which is on an attributable 51% basis, and is subject to trading conditions. Venetia continues to transition to underground operations during 2022, with ramp-up expected from 2023. Copper business unit only. On a contained-metal basis. Total copper is the sum of Chile and Peru. Chile production is subject to water availability. Chile production in 2022 impacted by lower expected grades at Collahuasi and Los Bronces, and lower water availability at Los Bronces. Peru production in 2022 subject to progress on ramp-up of operations. All guidance subject to the extent of further Covid-19 related disruption. 1. 2. 3. 4. 5. Total iron ore is the sum of Kumba and Minas-Rio on a wet basis. 6. 7. 8. 9. Nickel operations in Brazil only. The Group also produces approximately 20 kt of nickel on an annual basis as a co-product from the PGM operations. 2023 and 2024 dependent on bulk ore sorting technology and briquetting. 5E+gold produced metal in concentrate ounces. Includes own mined production (~65%) and purchased concentrate volumes (~35%). Subject to the progress of ramp-up of the longwalls and exclude thermal coal by-product from Australia. 5E+gold produced refined ounces. Includes own mined production and purchased concentrate volumes. Refined production is subject to the potential impact of Eskom load-shedding. Volumes are reported as wet metric tonnes (wmt). Product is shipped with -1.6% moisture. Subject to the third-party rail and port performance, as well as weather-related disruptions. 2024 subject to UHDMS plant coming online. Volumes are reported as wet metric tonnes (wmt). Product is shipped with -9% moisture. Anglo American 39
View entire presentation